Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

This page provides the current status of any meeting/conference room that has had an AV/technical issue reported.

Room

Status

Notes

Contact

Last Update

Estimated On-line Date

Wall Main

Limited AV

Audio is not working when connecting via HDMI wall panel. Campus is working on the issue.

Sandro Munoz

08/12/2024

09/14/2024

Shasta MPR

Limited AV

Left-side multi-panel display is offline. Right-side and projector are working as intended. A ticket has been opened with our vendor.

Sandro Munoz

08/14/2024

09/24/2024

Olive Main

Offline

The projector and audio system are offline. The projector will be replaced.

Jerry Arretche

08/14/2024

10/01/2024

The status above reflects the last known room status. CSG does not update the status until a ticket is submitted indicating a problem with the room.

  • No labels