Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

This page provides the current status of any meeting/conference room that has had an AV/technical issue reported.

Room

Status

Notes

Contact

Last Update

Estimated On-line Date

Wall Main

Limited AV

Audio is not working when connecting via HDMI wall panel. Campus is working on the issue.

Sandro Munoz

08/12/2024

09/14/2024

Shasta MPR

Limited AV

Left-side multi-panel display is offline. Right-side and projector are working as intended. A ticket has been opened with our vendor.

Sandro Munoz

08/14/2024

09/24/2024

Olive Main

Offline

The projector and audio system are offline. The projector will be replaced.

Jerry Arretche

08/14/2024

10/01/2024

If you do not see a room listed, the room is assumed to be working properly with all AV functions operational. The status above reflects the last known room status. CSG does not update the status until a ticket is submitted indicating a problem with the room.

  • No labels