Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

...

Smartsite 2.4.1 Upgrade

Of special note is that key are the Jiras are linked to SAK-857, the QA Test Plan for Smartsite 2.4.1 summer upgrade. This upgrade includes Assignments post-2.4 and Gradebook 2.5 as well as general and specific enhancements and bug fixes for key tools. The testing period for this upgrade was 7/23/07 - 8/17/07.

User impact details are available at: Smartsite 2.4.x summer upgrade

Smartsite 2.4.x Head Upgrade

Jiras linked to SAK-998, the QA Test Plan for Smartsite 2.4.x Head upgrade. This upgrade includes fixes to a number of key tools including Resources, Assignments, Gradebook, Messages, Forums, and Chat. The testing period for this upgrade is 9/4/07 - 9/19/07.

Test plan details are available at: /wiki/spaces/UCDSAKAI/pages/120456076

Current Test Status

Include Page
UCDSAKAI: General v2.4.x TestsUCDSAKAI:
General v2.4.x Tests
Include Page
UCDSAKAI: QA Sakai v2.4.x patchesUCDSAKAI:
QA Sakai v2.4.x patches
Include Page
UCDSAKAI: UCD-specific User-Interface 2.4.x Test PlansUCDSAKAI:
UCD-specific User-Interface 2.4.x Test Plans
Include Page
UCDSAKAI: UCD-specific 2.4.x Code IntegrationUCDSAKAI:
UCD-specific 2.4.x Code Integration
Include Page
UCDSAKAI: Sakai v2.4.x EnhancementsUCDSAKAI:
Sakai v2.4.x Enhancements